The Ultimate Guide to Builder’s Quotes in 2025

Planning Your Build?

The Ultimate Guide to Builder's quotes in 2025

The Ultimate Guide to Builder’s Quotes in 2025

When planning to build a home, one of the most important steps is obtaining a builder’s quote. However, understanding the various stages of a builder’s quote is essential to avoid surprises. The pricing can vary greatly from initial per m² prices to final, detailed estimates based on your home’s design. Here’s a guide to understanding obtaining a builder’s quote in NSW.

Type 1: Initial Estimate – The Per m² Price

Per square metre, pricing is calculated based on the total area in square metres (m²). For example, building a 500m² home at $2,000 per square metre would cost approximately $1,000,000. When converted to squares (1 square = 9.29m²), the same 500m² home equals roughly 53.8 squares. This pricing method is typically used for preliminary cost estimates only.

For instance, if someone wanted a 30-square home, a builder could provide a general cost estimate without needing a complete set of plans. However, this would only be a rough range, as per square metre pricing needs to be more precise to determine a final figure. Before any design or documentation is completed, builders can offer an estimate based on per m² pricing. In 2025, the average cost per square metre in NSW ranges from $1,800 to $3,000 for a single-storey home and $2,000 to $4,000 for a two-storey home.

At this early stage, a builder’s estimate is based solely on your preferred home size and is subject to change depending on your design, materials, and finishes. Volume builders may offer a fixed price for homes from their range, often starting with a “base” price for a simplified design version. However, this base price may not match your desired quality or style.

An important note: Gross Floor Area (GFA) differs from the actual size of the home the builder will construct. If your drawings include a Gross Floor Area calculation, this figure should not be used for per m² preliminary pricing estimates. To understand this distinction in more detail, check out our breakdown here.

When budgeting for a project, it is vital to account for more than just construction costs. Key components such as consultant fees, landscaping, and government contributions can have a significant impact on the total budget. As illustrated in the “Project Costs” diagram, construction typically accounts for 70% of the costs, while professional consultants, fees, and landscaping comprise the remaining portions. Similarly, the “Building Costs” diagram highlights the breakdown of costs within construction, including the building envelope, finishes, and contingency. These visual guides underline the importance of considering all elements to avoid unexpected expenses and ensure your budget accurately reflects the entire scope of the project.

A circular pie chart showing the breakdown of project costs with four categories. Construction, represented in yellow, accounts for 70% of the total. Landscaping, shown in light green, accounts for 13%. Professional consultants, in dark green, represent 8%, and fees and contributions (government and services), in light blue, make up 9%. The chart is titled "Project Costs," and a colour-coded legend is displayed on the right. The EzFeasy logo with the tagline "Making property lemon squeezy" is in the bottom-left corner. The background is dark blue.
A circular pie chart titled "Building Costs" shows the breakdown of costs into six categories. The largest segment, "Building Envelope," is in light pink and accounts for 46.5%. "Fittings," in lavender, and "Finishes," in purple, each represent 15%. "Services," in light blue, makes up 10.5%. "Preliminaries," in red, account for 7%, and "Contingency," in pink, is 6%. A colour-coded legend is displayed on the right side. The EzFeasy logo with the tagline "Making property lemon squeezy" is in the bottom-left corner. The background is dark blue.

Type 2: Be Cautious of “From” Pricing

Many volume home builders advertise prices as “from” a certain amount. This can be enticing, but be cautious when you see these prices—they often represent the bare minimum. For example, the base price might include:

  • Bathrooms with the bare minimum tiling required to meet compliance standards.
  • Rooflines with the simplest design, just enough to pass inspection, and may not cover external areas such as the front porch, alfresco, or laundry door.
  • An alfresco area may only include a door leading onto grass, with no proper outdoor space built.
  • Small windows with basic specifications that meet the minimum rating, such as just 10% of the room’s area.

These “from” prices are designed to get you in the door, knowing you will likely upgrade items during selection. Builders anticipate that you’ll opt for higher-quality finishes, and the final cost will rise.

The builder might offer even cheaper options in smaller developments like granny flats, such as vinyl cladding and vinyl flooring that mimics timber planks. While these materials are cost-effective, they may need to meet your expectations for durability or appearance.

Image of a roll of vinyl flooring with a timber looking finish.

This pricing strategy is often called “loss leader pricing,” where a low initial price is offered to attract customers, to recoup the loss through upselling or additional purchases later in the process. In the case of builders, it involves offering a base price for a home that seems attractive but doesn’t include the full range of features, knowing that the customer will likely upgrade various aspects of the build, resulting in higher costs. Another term sometimes used is “bait-and-switch pricing,” where the builder “baits” the customer with an attractive initial price but “switches” to higher prices once the customer is committed to the project.

Type 3: Concept Design Stage – More Accurate Estimates

Once you have selected or completed a concept design, the builder can provide a more detailed quote. This will be based on your home’s size and layout, but the estimate’s accuracy will still depend on the design stage. If you’re using a volume or project home builder, they’ll likely have a set range of designs you can choose from, as they typically don’t offer custom design services.

The builder’s quote will be more informed at this stage, but it will still be based on assumptions. For example:

  • Site Costs: The builder may include estimates for site preparation, but this will be based on a generic assumption rather than the actual conditions of your land.
  • Foundation Costs: Builders will assume standard foundation types, but depending on the site’s topography or soil condition, this may require adjustments later.
  • Window Requirements: Factors like BASIX (Building Sustainability Index) will influence window sizing and performance. At this point, the builder will likely make assumptions about window specifications based on the most common requirements.

While this stage provides a more accurate estimate than the initial per m² quote, it’s still important to understand that many assumptions may change once detailed reports like BASIX or site classification are completed. Builders often expect these changes and will plan for variations as the design process progresses.

Young man estimating quantities of a set of plans.

Type 4: Contract Pricing – The most Accurate Pricing Based on Full Design Before commencing construction

The final stage of the builder’s quote is when the full design and construction details are completed. At this point, your builder will better understand site-specific costs, foundation needs, window requirements, and any additional factors like BASIX compliance. The quote will reflect the true cost of building your home.

This is when you should receive an accurate, itemised quote that reflects your chosen materials, finishes, and design. Any project changes identified during earlier stages (like site-specific foundation work or window upgrades) will now be included in the final price.


Key Items Confirmed at Different Stages

Without the information below, your construction quote can never be accurate, it will be at best a guestimate. To ensure you don’t have these types of surprises, ensure that before you rely on the construction quote for your financial planning of the project, these items are finalised.

  1. Architectural Drawings – At the design stage, the architectural drawings confirm the home’s layout, the sizes of windows and doors, the amount of joinery, the roof type, and the exterior finishes. These drawings are essential for determining the overall design, spatial flow, and material choices for your home.Land Surveyor using surveying equipment to complete a detail and level survey
  2. Detail and Level Survey with Final Design—This confirms the exact topographical features of the site. Combined with the architectural design, it determines factors like the need for balustrades, drop-edge beams, retaining walls, and earthworks cut and filled. These aspects are critical for ensuring the home is built to suit the specific site conditions.
  1. Geotechnical Assessment and Site Classification – This assesses the type of soil on the property and wind rating. It provides accurate information for the structural engineer to design the correct structural elements for your site, such as whether screw piers, concrete piles, a thicker slab, or a specific type of slab is required, along with bracing details.
  2. Structural Engineering—This stage determines the structure of the slab, including all the structural elements such as the slab, frame, structural steel, and roof members. It ensures the home’s foundation and frame meet the site’s requirements and the overall design.
  3. Stormwater Drainage Design – This confirms the amount and type of downpipes, pipe sizes, tank sizes, pits, absorption trenches, and any other necessary stormwater infrastructure. Proper drainage is crucial for protecting the home from water damage and ensuring it complies with local regulations.
  4. BASIX Certificate – This determines requirements for rainwater reuse, solar systems, window specifications (e.g., double glazing), insulation, and shading. It ensures your home meets sustainability standards and reduces energy consumption, aligning with NSW environmental policies.
  5. Bushfire Report – If the site is located in a bushfire-prone area, this report identifies additional construction requirements to mitigate the effects of bushfires. It may affect the choice of materials and design, such as fire-resistant cladding or glazing.
  6. Flood Information – This will determine the necessary height and structural requirements for homes in flood-prone areas to ensure safety in flood conditions. The design may include raised foundations or other adaptations to meet safety standards.
  7. Selecting Interior Finishes – This stage involves selecting materials and finishes for the home’s interior, such as doors, door furniture, taps, basins, baths, kitchen fittings, joinery, sinks, appliances, flooring, tiling, and more. These selections help finalise the look and feel of your home and are crucial for the builder to provide an accurate cost.

Why Do Variations Still Occur?

Even after all the critical items have been finalised, selected, and confirmed, variations can still arise during construction. These are usually unexpected or unforeseen costs not initially accounted for in the builder’s quote. Below are several common reasons why variations occur:

Unforeseen Site Conditions

Sometimes, hidden issues not identified during earlier assessments or surveys may surface once construction begins. For example, rocks not discovered in the geotechnical report may need to be excavated, adding significant costs to the project. Similarly, when renovating or extending an existing home, rotted timber or hidden structural issues in walls or framing concealed by plasterboard may be uncovered, requiring repairs or reinforcements.

Changes in Selections or Design

Homeowners sometimes change their minds about selections or design elements after the project is underway. For instance, altering the layout of a bathroom or kitchen where plumbing and electrical work have already been installed can be costly, especially if pipes are already set into the slab. These changes require additional labour and materials to accommodate the new layout, increasing costs.

Regulatory Changes or Compliance Issues

During construction, local regulations, building codes, or compliance requirements may change. For instance, updates to BASIX requirements, changes in environmental regulations, or modifications to fire safety standards can result in additional work or modifications to the design that weren’t anticipated during the quoting stage.

Supply Chain Issues or Material Price Fluctuations

The cost of materials can fluctuate throughout a build due to market conditions or supply chain disruptions. For example, if the price of timber, steel, or insulation increases after a project has started, the builder may need to adjust the budget to accommodate these changes.

Site Access or Environmental Factors

Changes in site access, such as restrictions due to weather or unforeseen environmental factors (like heavy rain that delays excavation), can also lead to delays and additional costs. This may require reworking parts of the schedule or adjusting construction methods to account for these issues.

Architectural or Structural Modifications

Minor adjustments to the design made during construction, such as altering window sizes, moving walls, or upgrading finishes, can lead to variations in the original cost. These adjustments often require re-engineering certain structural elements or revising architectural plans, which can incur additional costs.

Hidden Services or Infrastructure

Sometimes, existing utilities or infrastructure, such as old pipes, electrical wiring, or underground services, were not documented. Once uncovered, these might need to be rerouted or upgraded to meet current standards, which can add unforeseen costs to the project.

Quality Assurance and Site Management

During construction, the quality of work may not meet the builder’s expectations or standards, requiring additional work to rectify issues. Whether it’s structural adjustments, correcting an oversight, or improving workmanship, these factors can change the project’s cost.

How Do Builders Quote?

Builders typically provide quotes based on the scope of work, design, materials, and project complexity. The process usually begins with an initial assessment of the site and a discussion with the homeowner about their requirements. After considering factors like the size of the home, the type of finishes, and the location, the builder prepares a detailed estimate. This can evolve as the design becomes more refined, with factors such as site conditions, labour costs, and material prices influencing the final quote. Depending on the stage of the project, quotes may be based on a per m² rate or a detailed breakdown of materials and services required.

How to Check Builder Reputation in NSW?

To check a builder’s reputation in NSW, review online platforms such as Google Reviews, ProductReview, or Trustpilot for feedback from previous clients. You can also check if the builder is registered with the here and whether they hold the necessary licences for the work they intend to do. Next, you should check their projects and if any claims have been made against the Home Building Compensation Act. The insurance a Builder must take out to protect you as the homeowner if the builder dies, goes bankrupt or goes missing during the project. You can check this here.

Additionally, asking for and following up on references from previous clients or reviewing their portfolio of past projects can provide insight into the quality of their work. Membership in industry bodies like the Master Builders Association or Housing Industry Association (HIA) can also indicate a builder’s professionalism and commitment to industry standards. Awards can also reflect a builder’s skill and reputation, as they often signify the builder has exceeded industry standards or demonstrated exceptional craftsmanship, providing an added trust in their abilities.

How Much Do Builders Charge Per Hour in NSW?

In NSW, builder rates can vary depending on the type of work, the builder’s experience, and the region. On average, hourly rates for builders range from $100 to $300 per hour. For more specialised work or experienced builders, rates can exceed $300 per hour. It’s important to clarify the rate structure with the builder upfront, as some may charge per project or have flat rates for specific services rather than hourly billing. Always ask for a detailed quote to avoid unexpected costs later on.

Do Builders Quote for Free?

Many builders offer free quotes, especially for smaller projects or basic work like renovations or extensions. However, for more complex projects, such as custom homes or large-scale developments, builders may charge a fee for preparing a detailed quote. This is often because the process of creating an accurate, itemised quote requires significant time and effort, including site visits, design assessments, and consultations. It’s important to confirm with the builder whether a fee applies before requesting a quote.

Is It Legal to Charge for a Quote in Australia?

Yes, it is legal for builders to charge for a quote in Australia, particularly when it involves detailed assessments for larger or more complex projects. While many builders provide free quotes for basic work, more detailed or customised quotes often require an investment of time and resources from the builder, which may justify a fee. Builders must inform the client upfront if they intend to charge for a quote, which should be agreed upon before any work begins. However, charging for a quote must be reasonable and in line with the scope of the quoted work.

Key Takeaways

Building or renovating a home is a complex process, and understanding the stages of a builder’s quote is essential for managing expectations and costs. From the initial per m² price to the more accurate contract pricing based on a complete design, many factors can influence the final cost of your project.

Despite having a fully finalised design, variations can still occur. Unforeseen site conditions, selection changes, regulatory updates, and hidden issues can all lead to unexpected costs. Additionally, altering designs or layouts mid-project or adjusting to market fluctuations in material prices can also impact the overall price.

It’s important to work closely with your builder and ensure all details are confirmed before construction begins. While variations are sometimes unavoidable, clear communication, thorough planning, and careful selection of materials and finishes can help minimise surprises. By understanding the process, homeowners can make informed decisions, avoid unnecessary costs, and keep the project on track for a successful outcome.

  1. The EzFeasy Guide: Identify Quality Land for Development in 2025

    EzFeasy Guide to Land for Development 2025

  2. The Preparing for a Successful Development Application in 2025

    EzFeasy Guide to getting your DA approved fast in 2025.

  3. Navigating Council Approval: How EzFeasy Simplifies the Approval Process

    One of the primary challenges faced by property owners and developers is deciphering the extensive and often convoluted documents provided by councils, such as DCPs and LEPs.